• Home
  • Local News
    • Chillicothe
    • Waverly
    • Bainbridge
    • Frankfort
    • Kingston
    • Londonderry
    • Piketon
    • Greenfield
  • Obituaries
  • Business Spotlight
  • Business Directory
  • Government
  • Mugshots
  • Contact
  • Contact
  • The Guardian Ethics
  • Download the SVG App
  • Scioto Valley Guardian Email Newsletters
  • Events
  • Facebook Page
  • Twitter
Skip to content
  • Contact
  • The Guardian Ethics
  • Download the SVG App
  • Scioto Valley Guardian Email Newsletters
  • Events
  • Facebook Page
  • Twitter
cropped-SVG-main-logo-new.png

Scioto Valley Guardian

Covering Breaking News in the Scioto Valley!

  • Home
  • Local News
    • Chillicothe
    • Waverly
    • Bainbridge
    • Frankfort
    • Kingston
    • Londonderry
    • Piketon
    • Greenfield
  • Obituaries
  • Business Spotlight
  • Business Directory
  • Government
  • Mugshots
  • Contact
Posted inGovernment, Local News, Statewide

Urenco USA produces first commercial LEU+ fuel cylinder in New Mexico

by Connor DeWine, Staff Writer November 2, 2026

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X
  • Print (Opens in new window) Print
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Share on Reddit (Opens in new window) Reddit
  • Share on Threads (Opens in new window) Threads
  • Share on Nextdoor (Opens in new window) Nextdoor

EUNICE, N.M. — Urenco USA has produced its first commercial cylinder of low-enriched uranium plus, or LEU+, the company announced Monday, marking what it called the first commercial production of the higher-enriched nuclear fuel product in the Western world.

The milestone opens a new fuel option for existing light water reactors and for advanced reactor designs under development that require higher levels of enriched uranium, according to the company.

“A tremendous amount of work has gone into preparing our plant and our staff to reach this achievement,” Jody Blackshear, managing director of Urenco USA, said in a statement. “Through the coordinated efforts of teams from across our site and company, we can now supply an innovative fuel option for our customers and support the next generation of nuclear fuel technologies.”

Urenco USA operates the National Enrichment Facility in Eunice, a uranium enrichment plant that began operating in 2010. Access to LEU+ will let existing reactors run longer cycles between refueling outages, reducing operations and maintenance costs, the company said. Several advanced reactor technologies in development are also expected to use LEU+ as fuel.

LEU+ can additionally serve as feedstock for producing high-assay low-enriched uranium, or HALEU, which Centrus Energy has been producing at its Piketon, Ohio, enrichment plant as part of a separate, multibillion-dollar expansion of domestic enrichment capacity.

Natural uranium is composed of more than 99% U-238 and less than 1% U-235, the fissionable isotope. Standard low-enriched uranium raises the U-235 content to between 3% and 5%. LEU+ raises that level to between 5% and 10%, while HALEU — which requires a dedicated facility and separate federal authorization — is enriched to between 10% and 20%.

Urenco USA received authorization from the U.S. Nuclear Regulatory Commission in September 2025 to enrich uranium up to 10% U-235, making it the first commercial uranium enricher authorized to produce LEU+. All of the plant’s gas centrifuge cascades are licensed to produce the product, the company said.

The company is also expanding its New Mexico facility, with plans to grow domestic enrichment capacity to more than 7 million separative work units over the next decade. Construction on a new enrichment plant at the site is set to begin in 2029, adding 2.1 million separative work units of capacity, with initial cascades starting production in 2032 and additional cascades installed through 2036.

Urenco USA’s existing facility has an annual capacity of 4.3 million separative work units, meeting about one-third of current U.S. demand for low-enriched uranium, according to the company. More than 500 employees and long-term contractors work at the site, which has delivered every customer order on time since its first product shipment in 2012.

The information contained in this story was obtained from Urenco USA.

Tagged: src-email-urenco-leu-plus-first-cylinder

Connor DeWine, Staff Writer

Connor is a staff writer for the Guardian. More by Connor DeWine, Staff Writer

In Case You Missed It

  • Chillicothe paper mill sale and secrecy at city hall collide as glove company faces mounting legal troubles
  • A sheriff patrol car with emergency lights on sits behind yellow stop tape at a nighttime crime scene
    Two people found dead in Ross County
  • Group of officials walking through the large warehouse floor of the former Chillicothe Paper Mill, now being redeveloped by U.S. Paper Mill Company
    $1.5 billion high-performance computing campus planned for former Chillicothe Paper Mill
  • Booking photos of Gary Siders II, Christina Siders, Gary Siders Sr., and Elizabeth Siders, four family members charged with child endangering in Vinton County, Ohio
    Vinton Co. Sheriff says children lived in conditions worse than livestock; 4 plead not guilty
  • House of Horrors: 16 children found in horrendous conditions in Vinton County, Ohio
    House of Horrors: 16 children found in life-threatening conditions in Vinton Co. home
Photograph from Scioto Valley Guardian coverage: White Logo Svg Dark
  • Facebook Page
  • Twitter
© 2026 Scioto Valley Guardian Powered by Newspack Privacy Policy

Gift this article